Wiring

Mitsubishi M / MXZ · S1 S2 S3

S1 / S2 / S3

S1 / S2 / S3

M-series wall and MXZ multi-zone. S1/S2 power, S2/S3 comm on most M-series. Not Daikin P1/P2 and not 24V thermostat cable.

Written circuit description only — FieldBench does not redraw maker schematics. Example: R to W closes on a heat call; verify 24V at W1 before you change the IFC.

Open manufacturer PDF

S1 / S2 / S3

Head to outdoor, or outdoor to branch box on MXZ.

Indoor head

Voltage on S1/S2 (power) vs S2/S3 (comm) per THAT outdoor diagram.

  • S1PowerLine
  • S2Power / comm commonLine
  • S3CommData

Outdoor / branch box

Same three. Never megger the pair. Isolate heads one at a time on U4.

  • S1PowerLine
  • S2CommonLine
  • S3CommData

Landing

  • LineHead S1outdoor S1

    Line / power — not 24V

  • LineHead S2outdoor S2

    Common

  • DataHead S3outdoor S3

    Comm. No 240 on this pin.

Prove it

  • S1/S2 power vs S2/S3 comm per the diagram on THAT outdoor.
  • U4: isolate indoors (power down first).

Do not

  • Do not treat this as 24V R/C/Y.
  • Do not assume Daikin P1/P2 or Carrier ABCD.
  • Never megger S2/S3.

S1/S2/S3 is the published M-series / MXZ landing.

Plates on this landing