Wiring

Furnace · single-stage 24V

R / C / W / Y / G

R / C / W / Y / G

Conventional single-stage furnace IFC. One W. Cool Y passes through to the outdoor. No ComfortBridge, no ABCD, no W2.

Written circuit description only — FieldBench does not redraw maker schematics. Example: R to W closes on a heat call; verify 24V at W1 before you change the IFC.

Open manufacturer PDF

Heat sequence

  1. 1Power. L1 / N → IFC → transformer → R120V in, 24V out
  2. 2Call. Stat W → IFC W~24 VAC
  3. 3Draft. IFC → inducer → PS close120V motor, 24V prove
  4. 4Ignite. IFC → HSI120 VAC
  5. 5Gas. IFC → valve~24 VAC
  6. 6Flame. Rod → IFCµA DC
  7. 7Blow. IFC → heat speedAfter flame prove

24V single-stage heat

Door card is one-stage. Twin terminal empty unless the job is actually twinned.

Wall thermostat

Single-stage heat/cool. W2 from a leftover two-stage stat does nothing useful.

  • R24V hot from the IFC24V
  • CCommon24V
  • WHeat24V
  • YCool — also starts the outdoor24V
  • GFan24V

Furnace IFC

Transformer lives here. Y out to the outdoor contactor. TWIN empty on a standalone.

  • RHot to the stat24V
  • CCommon — must reach the outdoor24V
  • WHeat call24V
  • YCool in / cool out24V
  • GBlower24V
  • TWINEmpty unless twinned24V

Landing

  • 24VIFC Rstat R

    ~24 VAC hot

  • 24VIFC Cstat Coutdoor C

    Common

  • 24VStat WIFC W

    Heat. Stays in this cabinet.

  • 24VStat YIFC Youtdoor Y

    Cool / contactor

  • 24VStat GIFC G

    Fan. Does not go outdoors.

IFC harness — single-stage heat

After W arrives. This is the gas train, not the thermostat strip.

Transformer + fuse

120V primary. 24V secondary. Dark stat = fuse / door / transformer first.

  • L1 / N120V to the IFCLine
  • XFMR24V to R24V
  • FUSEOn the IFC24V

24V safety chain

Door, limit, rollout in series. Open anywhere kills heat.

  • DOORInterlock24V
  • LIMITMain limit — rise / no airflow24V
  • ROLLOUTManual reset. Do not jumper and leave24V

Inducer + one pressure switch

W → inducer 120V → PS closes → IFC continues. One hose, one switch.

  • IND120V from the IFC to the inducerLine
  • PS24V prove back to the IFC24V
  • HOSESingle hose. Do not add a second because two-stage boards have two.24V

HSI + single valve

Igniter is 120V from the IFC. Valve is 24V. Flame rod is µA DC back to the IFC.

  • HSI120V hot-surface igniter — not 24VLine
  • VALVE24V to the single solenoid24V
  • FLAMEµA DC on the rod. Not a 24V circuit24V

9-speed tap ECM

F01–F09 on the harness. Heat tap and cool tap are separate. Not a 14-pin serial motor and not a run cap.

  • F01–F09Speed taps on the IFC / harness24V
  • HEATDefault often F02 — F01 is an E3 generator on many 9-speed doors24V
  • COOL / Y / GCool tap. Wrong tap freezes the coil and looks like LPS outdoors.24V

Landing

  • LineL1IFCinducer

    120 VAC after W

  • 24VIFCPSIFC

    ~24 VAC prove. Open PS = no ignition.

  • LineIFCHSI

    120 VAC during trial

  • 24VIFCgas valve

    ~24 VAC after flame prove starts

  • 24VFlame rodIFC

    µA DC. Not 24V.

  • LineIFCblower

    IFC heat speed / tap

Prove it

  • 24 VAC from R to C at the IFC. Fuse / transformer first if the stat is dark.
  • W at the IFC under a heat call. Then inducer / igniter / valve per THIS door card.

Do not

  • Do not land a ComfortBridge 1/2 or Infinity ABCD pair on this IFC.
  • Do not hunt W2 / E8 / high-fire on a one-stage door.
  • TWIN must be empty on a standalone.

9-speed tap, PSC, and CT motors share this thermostat landing. The motor is on the IFC harness diagram.

Plates on this landing